Providing Solutions In The Industry — NIS ISO 9001:2015 Certified & ISO/IEC 17025 Accredited

+ (234) 907 004 2444
logo
logo
  • Home
  • Services
    • Asset Integrity Management
    • Lifting Equipment Inspection
    • Instrumentation & Calibration
    • Construction
  • About Us
    • Commendations & Awards
    • Professional Membership
    • Our Partners
    • FAQ
  • Solutions
    • Composite Technology
    • Protective Packaging
  • Products
  • Training
    • Banksman & Slinger Training
    • Earth Moving Equipment Operator
    • Forklift Operator
    • Lift Operations Planning
    • Lifting Equipment Maintenance
    • LOLER Awareness
    • Management of Lifting
    • Manual Handling Awareness
    • Mobile Crane Operator
    • Overhead Crane Operator
    • PUWER Awareness
    • Rigger Training
    • Working At Height Awareness
  • Contact Us

Motor and Phase Rotation Tester

Have you any question or need any help for work consultation

Contact Us

Product Category

Cygus Instruments

  • Cygnus Underwater MK4 UTG Kit
  • Cygnus 1 Intrinsically Safe Kit
  • Cygnus 2 General Purpose MK5 Ultrasonic Thickness Gauge Kit
  • Cygnus 4 General Purpose MK5 Ultrasonic Thickness Gauge Kit
  • Cygnus Hatch Sure Hatch Cover Leak Detection System

Delta Electronics

  • Smart Sensor
  • Pressure Sensors
  • Temperature Controllers
  • Power Meter
  • Text Panel HMI – Human Machine Interfaces

Megger

  • PAT410, PAT420 and PAT450: FULL DATABASE DRIVEN PORTABLE APPLIANCE TESTERS
  • HV Tester 25: HIGH VOLTAGE GENERATOR
  • RCDT310, RCDT320 and RCDT330: RESIDUAL CURRENT DEVICE TESTERS
  • BITE3: BATTERY IMPEDANCE TEST EQUIPMENT
  • MIT300 Series: INSULATION AND CONTINUITY TESTERS

August 14, 2019
  • By : eatech
  • Comments Off on Motor and Phase Rotation Tester

Motor and Phase Rotation Tester

  • Description
  • Get A Quote

Product Description

The motor and phase rotation tester permits the electrical contractor or industrial maintenance electrician to permanently connect and tape the terminals of the motor being installed, without having to first energize the motor by a temporary hookup from a power source, if available, to determine motor rotation. Therefore, the test set eliminates the need for temporary connections that can be time consuming, costly and quite hazardous, particularly where many large, high-voltage motors are involved.

Also, certain types of drives should never be rotated in the wrong direction. In such cases, the temporary hookup or trial method, having a fifty-fifty chance of being wrong, can do serious harm.

The three motor leads on the left side of the test set are for attachment to the terminals of the motor being tested for rotation determination.

Fuses are inserted in the motor A and C test leads as protection in the event the user accidentally touches these leads to an energized circuit. These standard fuses are easily removed and replaced from their panel-mounted holders.

The three lines leading to the right of the test set are for direct attachment to energized ac power systems up to 600 volts to determine the system phase sequence. A four-position switch selects the test to be made – system phase sequence, motor rotation and transformer polarity. The selector switch connects a D-size dry cell into the circuit when the rotation of a motor or the polarity of a transformer is being checked. In the OFF position, both the meter and the battery are disconnected from all circuits.

A push switch is connected in series with the battery and opens the circuit during transformer polarity testing.

The dry cell is easily removed and replaced from its panel-mounted holder by a coin-slot access cap. The dc zero-center ammeter indicates correct or incorrect rotation or polarity by deflecting its pointer to the right or left. A zero or null adjuster is provided for the ammeter.

 

Visit Megger Website For More Information

Request for a quote

We sell only to companies in Nigeria. All fields are required

footer logo
Engineering Automation Technology Limited is committed to customer satisfaction, periodic review, innovative technology and application of appropriate standard while meeting statutory and regulatory requirements. Read More
Our Services
  • Construction
  • Instrumentation & Calibration
  • Asset Integrity Management
  • Composite Technology
  • Protective Packaging
Quick Links
  • Facilities
  • Our Partners
  • Products
  • Verify Certificate
  • Recruitments
Our Services
  • Construction
  • Instrumentation & Calibration
  • Asset Integrity Management
  • Composite Technology
  • Protective Packaging
Quick Links
  • Facilities
  • Our Partners
  • Products
  • Verify Certificate
  • Recruitments
Get In Touch
  • Corporate Office – 9A Olaitan Sebanjo Str Off Admiralty Way, Lekki Phase 1 Lagos
  • +234 9070042444
  • contact@eatlng.com, enquiries@eatlng.com
  • Monday – Friday : 08:00 – 17:00 GMT+1

Copyright © Engineering Automation Technology Ltd. 2019 - All rights reserved.

Search